A 6- years inspection will be carried out by AMAC Aerospace in conjunction with the installation of a KA band system. The Supplemental Type Certificate (STC) will be developed in-house by AMAC’s engineering department and is expected to be made available to the market to all ACJ operators by mid of March, 2018.